Site inspection reporting
Photos on a phone are not a report.
- HUMAN STEPS
- 1
- AUTOMATED
- 4
- RECLAIMED
- ~6 hrs/month
WF-09 — Site inspection reporting. 1 human step, 4 automated steps, about 6 hours a month reclaimed.
- Step 1. Site photos uploaded (WHATSAPP)
- Step 2. Sort by floor, element and location
- Step 3. Draft the site visit report
- Step 4. Extract snags and site instructions
- Step 5. Site visit report + snag list (PROJECT)
Risk points in this workflow:
- Work not per approved detail. A deviation spotted on site and not written down is a deviation nobody owns, and it is the architect who gets asked.
Steps you still do:
- Confirm the site instruction
What it actually does
- 01Site photos uploaded
- 02Sort by floor, element and location
- 03Draft the site visit report
- 04Extract snags and site instructions
- 05Site visit report + snag list
The risk this covers
Work not per approved detail
A deviation spotted on site and not written down is a deviation nobody owns, and it is the architect who gets asked.
What you still do
- Confirm the site instructionBefore it is issued
Everything else runs without you.